3,9 billions to Meråker Line and Trønder Line

(Adressa.no 2.4.2013)

The Norwegian Minister of Transport and Communications Marit Arnstad gave positive news about the electrification of the railway tracks in Norway, the Meråker and Trönder Lines.

Investigations have shown that a joint renovation of the two railway tracks north of Trondheim, the Meråker and Trönder Line, entails significant cost rationalisation.

But so far, the proposals have not been taken to the National Transport Plan (NTP).

Now the comment form the Minister gives hope for the future.

(Links below only in Norwegian, please, use your webb translator)

Read more: http://www.adressa.no/nyheter/nordtrondelag/article7334917.eceexternal link, opens in new window

and http://www.t-a.no/nyheter/article7334831.eceexternal link, opens in new window

http://sverigesradio.se/sida/artikel.aspx?programid=110&artikel=5491994external link, opens in new window

Are you interested in getting more news about the Meråker Line?


The projekt Elbanen STS publishes a newsletter (in Norwegian) and you can subscribe by emailing to gaute.dahl(at)stfk.no.
Example of latest letter. PDF

Uppdated: 2013-04-09
Eu and Baltic sea region Eu Baltic sea region